Category: Cottonwood Creek Project

We Have Liftoff for Cottonwood Creek Project

The collaborative Cottonwood Creek Daylighting project is picking up momentum.  The creek design shaping up and a new generation of Black Cottonwood trees are growing.This ambitious project will move Cottonwood Creek out of the buried flume where it has flowed for decades into an engineered creek channel on the east end of Julia Davis Park…. Read more »

High Flows in Cottonwood Creek

by Kathy Peter and Liz Paul On April 8, 2006, Cottonwood Creek reached its highest flow in the 16 years the current US Geological Survey (USGS) stream gage has been in operation. At 78 cubic feet per second (cfs), the flow was more than twice as high as the second highest peak flow recorded on… Read more »

Cottonwood Creek: “It Will Cost a Pretty Penny”

It must have been a dry July when the City of Boise founders platted the first streets in 1863. They established the city in the channel of Cottonwood Creek. Although Cottonwood Creek is a large tributary to the lower Boise River, it can dry up for months between rain storms and snow melt. The natural… Read more »

Birders Gather Data for Cottonwood Creek Project

by Heidi Ware Carlisle, BSU Intermountain Bird Observatory The east end of Julia Davis Park in downtown Boise will be transformed over the next year. What’s now a mono-culture of turf with scattered mature trees will make way for a vibrant small creek with aquatic and riparian vegetation taking root. Willows, Wood’s Rose, Golden Currant,… Read more »

Cottonwood Creek: “A Great Source of Trouble and Expense”

A deep freeze had clenched the Boise valley for weeks and snow lay thick on the foothills. In mid-January the temperature shot up to a balmy 50 degrees and rain began to fall.  Day after day the rain continued. On January 21, 1866, according to the January 23, 1866 edition of the Idaho Tri-Weekly Statesman,… Read more »