BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Boise River Enhancement Network - ECPv6.0.11//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.boiseriverenhancement.org
X-WR-CALDESC:Events for Boise River Enhancement Network
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Boise
BEGIN:DAYLIGHT
TZOFFSETFROM:-0700
TZOFFSETTO:-0600
TZNAME:MDT
DTSTART:20210314T090000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0600
TZOFFSETTO:-0700
TZNAME:MST
DTSTART:20211107T080000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Boise:20210330T180000
DTEND;TZID=America/Boise:20210330T190000
DTSTAMP:20260729T180130
CREATED:20210224T163831Z
LAST-MODIFIED:20210224T163831Z
UID:4370-1617127200-1617130800@www.boiseriverenhancement.org
SUMMARY:Caldwell Highway District To Build New Boise River Bridge
DESCRIPTION:BREN presents Canyon Highway District 4 Engineer Tim Richard\, P.E.\, to speak about the Old Hwy 30 Bridge replacement project.  The existing one-lane bridge was built in 1922. It needs to be replaced because it’s narrow and old. Building a bridge over the Boise River is a complicated task with many factors to consider.  Tim will explain the design and approval process and the steps that lie ahead. Pre-registration is required to attend this free program.
URL:https://www.boiseriverenhancement.org/event/caldwell-highway-district-to-build-new-boise-river-bridge/
LOCATION:Online\, ID\, United States
ATTACH;FMTTYPE=image/jpeg:https://www.boiseriverenhancement.org/wp-content/uploads/2021/02/OldHwy302.jpg
END:VEVENT
END:VCALENDAR